At the Stampin’ Up! Leadership conference they gave us the cutest bag – well it is really a purse this time.

The print on the fabric is the same as our Vintage Wallpaper Textured Embossing Folder.  And the ribbon accent on the front is our 1-1/4″ Striped Grosgrain Ribbon.  On the inside (I didn’t get a picture of that) is the a Stampin’ Up! label – and it is a red rubber stamp that is sewn in.  At my downline meeting last night someone else had their VB bag and they look exactly alike.  So I don’t know who made the bags we got but they look just like the VB bag.

At Memento Mall we were able to purchase some coordinating accessories.  And it is hard to resist – don’t we all love matching stuff?

There was a wallet – and it is much bigger than the wallet I have been carrying so I’ll have to figure out what to put in it.  Between all the little pockets in it and all the little pockets in my bag I’m sure I’ll lose lots of things inside them……

And then the coolest thing was the little item in the box.  Do you know what that is?

I had seen them before but never really looked into having one.  It is a purse holder.  You hang it on the edge of a table and it has a hook that holds your purse so you don’t have to set it on the floor.  And this one matches our bag and has a Stampin’ Up! logo on it.

Here it is in action hanging on the edge of my kitchen table.  And since I have so many nice little pockets in my bag it will have a nice little home and always be with me.

That is my little glimpse of leadership for you today.  I still have more to come – although you may have already seen a lot of it since other demos are posting their pictures too. And other things that I still have to share is our trip to the Ronald McDonald house this week, my downline meeting last night (what a great time we had), and class projects from last week’s Valentine class.  Lots to share….

We started construction on our sunroom/all-season room this week.  Well not we – they did.  Normally Greg does most of our renovating and construction projects around the house.  But they take a long time and this time we are having someone else do the work and they are moving at at feverish pace compared to what Greg does.  Wed/Thurs framing crew, Fri brought the electrician and today the roofers are here, Monday windows will be installed….it’s been busy and noisy around here the last few days.

Talk to you later…..